The Project
Paving seven and a half miles of 8 feet wide, 5 inches thick concrete recreational trail.
Project Specs
Year Completed | 2017 |
Length | 39,400 ft |
Width | 8 ft |
Type | Recreational trail |
Recreational trail
Riceville to Acme, IA
Paving seven and a half miles of 8 feet wide, 5 inches thick concrete recreational trail.
Year Completed | 2017 |
Length | 39,400 ft |
Width | 8 ft |
Type | Recreational trail |